- Company: Orica Chemnet
- Location: Mount Maunganui, New Zealand
- Date: August 2012 - August 2013
+ Overview
Contract Mechanical Services were engaged by Orica Chemnet to do the Mechanical and Piping installation for their Stormwater Stage 4 upgrade.
This consisted of:
- installing 2 x 120,000 litre Stormwater Storage Tanks
- installation of associated pumps, pipeworks and feeds to the system from various positions on site
- design, construction and installation of inground collection points
- installation of sump grating
- fabrication and installation of safe walkways around the new areas.
= Outcome
CMS completed all scheduled work - and additional unforeseen work - with no impact or downtime on the existing effluent handling system.
Our post contract evaluation was Excellant.
CMS Project Supervisor
Brian Dally, Gareth Lilley
Project Manager
Marie Grimshaw - Orica ESS
Listing Lead In Text:
Installation of 2 x 120,000 litre Stormwater Storage Tanks with associated pumps, pipework......